Tel: 01234 353271
PORO FAST
SOLUTIONS

Poro Fast Solutions Ltd has been formed because of our belief that Porotherm Blocks & Layher Scaffold will hold an ever-greater share in construction methods going forward. We will call this new method clayframe.construction both because of their speed and loading capacities.

These 2 systems go hand in hand in offering a safer and cleaner working environment. Porortherm holds all the keys to sustainability along with Layher’s all metal non-combustible components.

We have a winning team; if you would like to be part of that team please contact us at enquiries@porofastsolutions.co.uk

  • WE ARE BUILDING A SUSTAINABLE FUTURE

  • CLAYFRAME CONSTRUCTION

    CONSTRUCTION WITH POROTHERM USES AROUND 90% LESS WATER THAN TRADITIONAL METHODS

  • SCAFFOLDING

    LAYHER SYSTEM SCAFFOLDING IS ENGINEERED FOR SUPERIOR LOADING CAPACITY

The Benefits Of Porotherm

Poro Fast Solutions
11-13 Edison Road,
Elms Farm Ind Estate,
Bedford MK41 0HU
Tel: 01234 353271
P: 07802 251970
Professional Bodies & Affiliations
Search
Useful links
PORO FAST
SOLUTIONS
Copyright © 2021 | Poro Fast Solutions Ltd | All Rights Reserved
Website by Funky Grafix
magnifiercrosschevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram